Audit Equipment in Sutton site to assess computer room and cabinet
requirements within the London office. Design cabling infrastructure
to service new users and future expansion.
Installation of 198
New Category 5 enhanced outlets to new floor boxes. Install computer
room back bone fibre and UTP gigabit links. Due to EB's rapid
expansion within the first year of moving to London, a new building
was acquired.
TCS were contracted
to cable the new premises and arrange to have an external duct
put between the two buildings. We then installed external Fibre
and Multicore telephone cables to link directly to the existing
Network, eliminating the additional cost of extra ISDN lines.