Installation
of 120 outlets in Berlin and Paris with installations running in
succession.
T.C.S.
arrange the transportation of all necessary equipment to be delivered
and installed within a tight schedule. We had to design and install
all cable containment prior to the installation of the new cabling.
The
London Waterloo project entailed the installation of approximately
500 category 5 Enhanced Data outlets within a very difficult building.
The building consists of a solid floor and solid ceiling, without
any natural routes to carry 500 cables.
TCS designed an open cable tray system which was installed to the
ceiling slab and vertically to the walls. At the user end a special
metal flexible copex was installed to carry the cables to the desk
positions. We then opted to install a low smoke orange cable which
was neatly loomed to the cable tray and is in full view for the
staff and visitors.
|