Scope:
|
From drawings and tender specification, TCS Cabling were initially
requested to supply components to install 460 no Category 5E outlets
throughout six floors of a new-build structure in the heart of the
City of London. The cable and components selected were Hellerman-Tyton
and comprised Enhanced Category 5e UTP cable, outlet termination
modules and patch panels. The horizontal UTP cabling was installed
from the lower ground floor computer room utilising diverse routing
via North & South risers to each individual floor, then through
the installed false floor via cable tray to 3-compartment floor-boxes
positioned by the electrical contractors. As with any new fit-out
contract, the data cabling had to be carefully co-ordinated with
the other on-site trades to ensure a smooth installation with no
conflicts. The whole project, including an additional ninety-two
floor outlets and forty-eight inter-cabinet links, was completed
within tight time and accessibility constraints to enable the incoming
company to re-locate from existing offices in a controlled and problem-free
fashion.
|